Sabtu, 03 April 2010

Datsun 1200 Ute Update













And here they are after being ingnore for quiet sometimes. Engine is on it's place, all of the body work is done and now ready for the painting. Got some shipmet from Oz of some nity grity accessories as well.

Push for completion for the next gathering I hope.





Stripped Off Landy SIIA







Here are my Landy Series 2A 1967, after being stripped off at the local workshop near my place. Things that are working on progress: engine overhaul (replaced all of the pistons), harness replacement, total body restoration. I will add some snorkel and roof rack to flavour the adventure look on to the car.






Hopefully will be up and run in 3 weeks. Cross the finger....lol.